Loyola Medicine Pediatric Oncology Center
Client
Loyola Medicine
Industry
Healthcare
Delivery Method
CM at Risk
Architect
Project Profile
Michuda Construction successfully delivered the Loyola Medicine Pediatric Oncology Center, enhancing comprehensive cancer care services for children in the region. The project focused on creating a patient-centered environment equipped with advanced technology to support pediatric oncology diagnostics and treatments.
PROJECT PROFILE
Loyola Medicine Pediatric Oncology Center
Location: Maywood, Illinois
Client: Loyola Medicine
Delivery Method: Construction Manager at Risk
Size: Approximately 20,000 square feet
PROJECT OUTCOME
Michuda Construction successfully delivered the Loyola Medicine Pediatric Oncology Center, enhancing comprehensive cancer care services for children in the region. The project focused on creating a patient-centered environment equipped with advanced technology to support pediatric oncology diagnostics and treatments.
PROJECT SCOPE
Michuda Construction provided Construction Management at Risk services for the development of the Pediatric Oncology Center within Loyola Medicine's campus. The scope of work encompassed new construction and specialized fit-outs for treatment spaces, patient support areas, and staff workspaces.
Key Elements of the Project:
Patient Treatment Rooms: Creation of state-of-the-art oncology treatment rooms equipped with advanced radiation therapy machines, chemotherapy infusion bays, and supporting technologies.
Diagnostic Facilities: Incorporation of advanced imaging suites, including PET/CT and MRI capabilities, to support precise diagnostics for pediatric cancer care.
Supportive Care Spaces: Design and construction of child-friendly waiting areas, consultation rooms, and family support spaces, ensuring a comfortable and welcoming environment.
Specialized HVAC and Ventilation: Installation of systems designed to maintain strict environmental controls, necessary for sensitive medical procedures and equipment.
Electrical Upgrades: Integration of specialized electrical systems tailored to the needs of advanced medical equipment, ensuring uninterrupted operation.
Accessibility Enhancements: Compliance with ADA guidelines to ensure accessible patient and staff flow throughout the facility.
CHALLENGES & SOLUTIONS
Occupied Facility Coordination:Challenge: Construction work in a fully operational hospital posed significant challenges in minimizing disruptions to ongoing medical care.Solution: Implemented phased construction schedules, off-hour work shifts, and close coordination with hospital staff to ensure uninterrupted patient services.
Precision in MEP Systems:Challenge: Ensuring precise control and functionality of Mechanical, Electrical, and Plumbing (MEP) systems for sensitive oncology treatment areas.Solution: Engaged specialized MEP consultants, conducted detailed planning, and utilized advanced Building Information Modeling (BIM) technology for system integration.
Patient Comfort and Privacy:Challenge: Balancing cutting-edge treatment technology with the need for a comforting patient experience.Solution: Created thoughtfully designed spaces with durable finishes, soundproofing, and patient-focused amenities.