Michuda Construction served as the General Contractor for the development of the Abraham Lincoln Oasis, a 25,000-square-foot facility spanning over the tollway. The project focused on providing a functional and visually striking rest area that offered a wide range of amenities for motorists.
PROJECT PROFILE
Abraham Lincoln Oasis
Location: Tri-State Tollway (I-294), South Holland, Illinois
Owner: Illinois Tollway Authority
Delivery Method: General Contractor
Size: Approximately 25,000 SF
PROJECT OUTCOME
Michuda Construction delivered the Abraham Lincoln Oasis, a critical rest and service area for motorists along the Tri-State Tollway. The construction of this modern facility provided travelers with convenient access to dining, restrooms, and fuel services without leaving the highway, reflecting our commitment to quality infrastructure projects that support public needs.
PROJECT SCOPE
Michuda Construction served as the General Contractor for the development of the Abraham Lincoln Oasis, a 25,000-square-foot facility spanning over the tollway. The project focused on providing a functional and visually striking rest area that offered a wide range of amenities for motorists.
Scope of work included:
Structural Engineering and Construction: Building a complex structure that spanned the highway, requiring detailed engineering to ensure safety, structural integrity, and efficient construction in an active traffic environment.
Facility Construction: Development of a modern facility housing dining options, retail space, restrooms, and convenience areas for motorists.
Coordination with Multiple Stakeholders: Collaborating with the Illinois Tollway Authority, local officials, and subcontractors to deliver a facility that met high standards of quality and compliance with state regulations.
Infrastructure Integration: Integration of essential utility connections and highway infrastructure to support the operation of the facility, including traffic flow management and accessibility considerations.
CHALLENGES & SOLUTIONS
Construction Over Active Highway: Building a structure over an active tollway required extensive planning and coordination to ensure the safety of motorists and construction workers. Traffic management systems and phased construction plans were implemented to minimize disruptions.
Complex Structural Requirements: The unique over-the-highway design necessitated advanced structural engineering solutions, including load-bearing supports and reinforced steel construction to handle the weight and operational demands of the facility.
Logistical Coordination: Coordinating the construction of a large-scale facility within a constrained site and an active transportation corridor presented logistical challenges. Michuda’s project management team developed detailed schedules and worked closely with stakeholders to address these constraints.
KEY PROJECT ELEMENTS
Modern Design and Functionality: Creation of a traveler-focused facility providing essential services in a convenient location, enhancing the travel experience along the Illinois Tollway.
Safety and Quality Standards: Adherence to stringent safety and quality protocols throughout the construction process, reflecting Michuda’s commitment to delivering high-quality infrastructure projects.
Efficient Project Execution: Successful coordination and execution of a complex project within a high-traffic area, demonstrating Michuda’s expertise in managing challenging construction environments.