HEALTHCARE PRE-CONSTRUCTION

Better projects begin before construction

In healthcare, early decisions shape everything that follows—from cost and schedule to clinical operations, infrastructure, and long-term performance. Michuda helps owners and design teams turn uncertainty into a clear, buildable plan.

 

Pre-construction is where the project is won.

The greatest opportunities to protect cost, schedule, and operations exist before the documents are complete. Michuda brings construction intelligence into the process early — testing assumptions, identifying risk, and helping the team make informed decisions while there is still time to act on them.

Is the budget aligned with the design?

Continuous estimating and cost reconcilliation reveal where the project stands as decisions are made - not after the design and documents are complete.

How do we build around operations?

Phasing, logistics, enabling, shutdowns, access, infection control, and interim life safety are all evaluated against the healthcare environment.

Is the schedule achievable and realistic?

Design milestone, procurement, trade availability, regulatory requirements, and facility constraints are assembled into one executable plan. 

Where is the risk and how do we mitigate it?

Existing conditions, infrastructure, constructibility, equipment, and long-lead decisions are investigated before they become field issues. 

From early concept to field-ready plan

01

Understand

Define the clinical objective, operational constraints, existing conditions, stakeholders, budget, and schedule requirements

02

Test

Evaluate design assumptions through estimating, constructibility, logistics, phasing, procurement, and early trade engagement. 

03

Align

Create transparency around cost, schedule, and risk so the owner, design team, and construction team move forward together

04

Commit

Transition a validated plan into construction with continuity between the people who developed it and your field teams. 

Construction intelligence, applied early. 

Each process informs the others. Cost cannot be separated from schedule. Phasing cannot be separated from operations. Equipment cannot be separated from infrastructure. Michuda brings these decisions together in one coordinated pre-construction process. 

Conceptual Estimating

Cost Modeling

Continuous Budget Reconcilliation

Constructibility Reviews

Existing Condition Investigations

Phasing and Logistics Planning

Schedule Development and Validation

Enabling

Early Trade Assist

Long Lead Time Planning

Medical Equipment Coordination

Value Analysis

Shutdown and infrastructure planning

Permitting and Zoning Approvals

Risk and Decision Tracking

ICRA / ILSM

IMG_5298.heic
264.003 Riverside Medical Office Building Bourbonnais (1 (397).jpg

REAL VALUE. DELIVERED EARLY.

Early involvement. Measured value.

THE PROJECT

75,000 square foot, three-story, medical office building out of the ground. 

THE OPPORTUNITY

During the height of the COVID-19 pandemic our pre-construction team engaged trades early, locked in pricing, and expedited schedules 

THE RESULT

Over $500,000 in savings & 12 weeks ahead of schedule - beating a competitor to market and gaining valuable marketshare.

One healthcare specific construction team

Michuda's role is not to override design intent. It is to give owners and architects timely construction information so design decisions can be made with a clear understanding of cost, schedule, logistics, procurement, and operational impact. We are built for health systems and only health systems. 

7A2A3058.JPG

Bring us in while the right options are still available. 

Whether you're at concept, schematic-design, or early documentation, Michuda can help you move forward. 