top of page

CT Renovation

Client

Advocate Aurora Health

Industry

Healthcare

Delivery Method

CM at Risk

Architect

Matthei & Colin Associates

Project Profile

Michuda Construction successfully delivered the CT-1 Renovation at Advocate Christ Medical Center, transforming the existing imaging space to accommodate upgraded computed tomography (CT) technology. The project showcased Michuda’s ability to execute intricate renovations within an active healthcare facility, ensuring uninterrupted patient care and safety.

PROJECT PROFILE


Advocate Christ Medical Center – CT-1 Renovation

Location: Oak Lawn, Illinois Client: Advocate Christ Medical Center Delivery Method: Construction Manager at Risk

PROJECT OUTCOME

Michuda Construction successfully delivered the CT-1 Renovation at Advocate Christ Medical Center, transforming the existing imaging space to accommodate upgraded computed tomography (CT) technology. The project showcased Michuda’s ability to execute intricate renovations within an active healthcare facility, ensuring uninterrupted patient care and safety.

PROJECT SCOPE

Michuda Construction provided Construction Management services to renovate and upgrade the CT-1 imaging suite. The project included selective demolition, installation of advanced medical equipment, and integration of new mechanical and electrical systems tailored for the CT suite’s specific operational needs.

Key Elements of the Project:

  • Selective Demolition: Removal of existing walls, ceilings, and MEP systems to prepare the space for new CT technology and infrastructure.

  • Structural Modifications: Reinforced structural components to support the installation of the latest CT scanner and associated equipment.

  • Mechanical and Electrical Systems: Upgraded HVAC systems to maintain precise temperature and humidity control, ensuring optimal equipment performance. Electrical improvements included new power distribution, life safety circuits, and low-voltage integration for imaging technology.

  • Interior Finishes: Installation of new flooring, paint, and wall protection to create a clean and patient-friendly environment.

  • Equipment Integration: Coordination with the CT vendor to install and calibrate the new system, ensuring seamless operation post-construction.

CHALLENGES & SOLUTIONS

Occupied Facility Coordination:

  • Challenge: Conducting construction in a functioning hospital without disrupting patient services.

  • Solution: Implemented infection control measures, interim life safety precautions, and phased construction schedules to minimize impact.

Mechanical and Electrical Complexity:

  • Challenge: Integrating advanced mechanical and electrical systems to meet the CT unit’s demanding specifications.

  • Solution: Collaborated with specialized contractors to ensure compliance with technical requirements and rigorous testing before project handover.

Tight Timelines:

  • Challenge: Delivering the project within an expedited schedule to minimize downtime for imaging services.

  • Solution: Utilized meticulous planning, overlapping critical path activities, and off-hour work shifts to maintain the timeline.

VALUE TO THE CLIENT

Michuda Construction’s expertise in healthcare infrastructure ensured the successful completion of the CT-1 renovation, providing Advocate Christ Medical Center with a state-of-the-art imaging suite. The project was executed with precision, enhancing the hospital’s diagnostic capabilities while maintaining a patient-centric approach.


bottom of page