ED / SPD Addition and Renovation

Client

Ascension Health

Industry

Healthcare

Delivery Method

CM at Risk

Architect

Gresham Smith

Project Profile

At Michuda, we’re dedicated to building exceptional healthcare infrastructure. We recently completed three projects for Ascension Healthcare, expanding the hospital’s capabilities while overcoming complex challenges. These projects demonstrate our commitment to delivering high-quality results, even in challenging conditions, while prioritizing the needs of our clients and the community.

PROJECT SUMMARY

Ascension Healthcare Projects Location: Ascension St. Alexius Total Area: 46,442 sq.ft. Duration: 18 Months Architect & Engineer: Gresham Smith, TLC Engineering Solutions MEP Contractors: Excel Mechanical Services, Ewing Doherty Mechanical, Super Electric Delivery Method: Construction Manager

PROJECT SCOPE

  1. Emergency Department (ED) Addition

    • Scope: 9,442 sq.ft.

    • Challenge: Temporary Patient Drop-Off Point for EMS.

    • Solution: Converted Exam Room C into a temporary entrance with new sliding doors, a temporary canopy, and a workroom trailer for EMS. This ensured uninterrupted patient care during construction.

  2. Sterile Processing Department (SPD) Renovation

    • Scope: 11,500 sq.ft.

    • Challenge: Structural deflection due to a new Air Handling Unit (AHU).

    • Solution: Removed the AHU, redesigned the steel beam, and reinstalled both the steel and AHU, ensuring structural integrity without delaying the project.

  3. Emergency Department (ED) Renovation

    • Scope: 25,500 sq.ft.

    • Challenge: Working adjacent to the fire lane during key construction phases.

    • Solution: Developed a plan using cranes and pump trucks for materials, maintaining safety with traffic control and clear communication to protect staff, patients, and construction personnel.

OUTCOME

Michuda completed these projects on time and within budget, enhancing Ascension Healthcare’s ability to serve its community. Our innovative solutions allowed for seamless operations during construction, reflecting our dedication to quality and safety in healthcare construction.

 