Mozart Elementary School 1995
Client
Chicago Public Schools
Industry
Education
Delivery Method
General Contractor
Architect
Project Profile
Michuda Construction served as the General Contractor for the construction of Mozart Elementary School, located in Chicago's Logan Square neighborhood. This 43,000-square-foot facility was designed to provide a modern and conducive learning environment for students from pre-kindergarten through eighth grade.
PROJECT PROFILE
Mozart Elementary School
Location: Chicago, Illinois
Client: Chicago Public Schools
Delivery Method: General Contractor
PROJECT OVERVIEW
Michuda Construction served as the General Contractor for the construction of Mozart Elementary School, located in Chicago's Logan Square neighborhood. This 43,000-square-foot facility was designed to provide a modern and conducive learning environment for students from pre-kindergarten through eighth grade.
PROJECT SCOPE
Site Preparation: Comprehensive site clearing and grading to accommodate the new building footprint and associated amenities.
Structural Framework: Erection of a steel-framed structure with masonry exterior, ensuring durability and aesthetic integration with the surrounding community.
Classroom Facilities: Development of multiple classrooms equipped with up-to-date educational technology to support diverse learning modalities.
Specialized Spaces:
Science and Computer Labs: Dedicated areas designed to foster interactive and experiential learning in STEM subjects.
Library/Media Center: A resource-rich environment aimed at enhancing literacy and research skills.
Common Areas:
Multipurpose Gymnasium/Auditorium: A versatile space for physical education, assemblies, and community events.
Cafeteria: A well-appointed dining area designed to accommodate the student population efficiently.
Outdoor Amenities: Construction of playgrounds and recreational fields to promote physical activity and social interaction among students.
CHALLENGES & SOLUTIONS
Urban Construction Constraints: Navigating the logistical challenges of building within a densely populated urban area required meticulous planning and coordination to minimize disruption to the local community.
Timeline Adherence: Strict adherence to the project schedule was maintained to ensure the school opened in time for the academic year, achieved through effective project management and stakeholder communication.
IMPACT
The completion of Mozart Elementary School provided the Logan Square community with a state-of-the-art educational facility, enhancing the academic experience for its students and serving as a focal point for neighborhood engagement.