top of page

Ralph J Bunche Exterior Renovation

Client

Chicago Public Schools

Industry

Education

Delivery Method

General Contractor

Architect

Project Profile

Michuda Construction successfully completed the exterior renovation of Ralph J. Bunche Elementary School, enhancing the structural integrity and visual appeal of the school’s exterior. This renovation ensures a safe and durable façade for students, staff, and visitors, aligning with Chicago Public Schools' commitment to providing well-maintained educational facilities.

PROJECT PROFILE

Ralph J. Bunche Elementary School Exterior Renovation Location: Chicago, Illinois Owner: Chicago Public Schools Delivery Method: General Contractor

PROJECT OUTCOME

Michuda Construction successfully completed the exterior renovation of Ralph J. Bunche Elementary School, enhancing the structural integrity and visual appeal of the school’s exterior. This renovation ensures a safe and durable façade for students, staff, and visitors, aligning with Chicago Public Schools' commitment to providing well-maintained educational facilities.

PROJECT SCOPE

Michuda Construction served as the General Contractor for the exterior renovation of Ralph J. Bunche Elementary School in Chicago, Illinois. The scope of work focused on comprehensive improvements to the school’s exterior brick and masonry surfaces to enhance longevity, safety, and aesthetics.

The scope of work included:

  • Brick and Masonry Renovation: Restoration and repair of the existing brick façade, addressing weathered and damaged sections to restore structural integrity.

  • Masonry Cleaning and Tuckpointing: Thorough cleaning of masonry surfaces and tuckpointing to ensure proper sealing, water resistance, and an extended lifespan of the exterior walls.

  • Structural Reinforcement: Implementation of structural enhancements where necessary to improve the building’s resilience against environmental elements.

  • Safety and Compliance Measures: Adherence to all safety and building code requirements during the renovation process, ensuring a secure and compliant final product.

CHALLENGES & SOLUTIONS

This exterior renovation project required strategic planning and targeted solutions to maintain safety and minimize disruptions to school operations:

  1. Occupied School Site: Given the project’s location within an active school, Michuda prioritized safety by establishing protective barriers, scheduling work during non-peak school hours, and maintaining clear communication with school administrators.

  2. Aging Masonry: The existing brickwork presented various levels of wear and damage. Michuda’s team performed a detailed assessment to prioritize and execute repairs that would preserve the façade’s integrity and appearance.

KEY PROJECT ELEMENTS

  • Comprehensive Brick and Masonry Restoration: Repairs and cleaning to enhance the building’s exterior while maintaining historical character and integrity.

  • Safety and Compliance: Met all safety standards for construction activities within an occupied school environment.

  • Durability and Aesthetics: Improved the school’s exterior façade for long-term durability and visual appeal.



bottom of page