top of page

Von Stuben Junior High School 1929

Client

Chicago Public Schools

Industry

Education

Delivery Method

General Contractor

Architect

Project Profile

The completion of Von Steuben Junior High School in 1929 marked a significant chapter in Chicago's educational history and in the legacy of Michuda. As a monumental project during the late 1920s, the school exemplified the architectural and engineering expertise of its era and showcased Michuda's capabilities as a premier general contractor of substantial, ground-up educational facilities.

PROJECT PROFILE Von Steuben Junior High School (1929) Location: Chicago, Illinois Client: Chicago Public Schools Delivery Method: General Contractor



PROJECT OUTCOME The completion of Von Steuben Junior High School in 1929 marked a significant chapter in Chicago's educational history and in the legacy of Michuda Brothers Construction. As a monumental project during the late 1920s, the school exemplified the architectural and engineering expertise of its era and showcased Michuda Brothers Construction's capabilities as a premier general contractor of substantial, ground-up educational facilities.

PROJECT SCOPE Von Steuben Junior High School, built at the end of the Roaring Twenties, was conceived as an innovative and grand addition to Chicago’s public school system. The construction of this large-scale facility emphasized durability, architectural elegance, and functionality.

Key Elements of the Project:

  • Ground-Up Construction: Michuda Brothers Construction built the school entirely from the ground up, overseeing every aspect of construction, including the structural masonry, steel framing, and interior finishes. This scope demonstrated the breadth and depth of the company's capabilities during an era when contractors self-performed many aspects of a build.

  • Academic Facilities: The school featured spacious classrooms, science labs, and specialized educational spaces designed to meet the needs of a growing and diverse student population. The inclusion of state-of-the-art equipment for the time reflected a commitment to advancing education.

  • Architectural Design and Detail: The facility's exterior showcased the craftsmanship of the era, with ornamental stonework, expansive windows, and intricate masonry detailing that still stands today as a testament to the quality and craftsmanship Michuda brought to the project.

  • Gymnasium and Community Spaces: Recognizing the importance of physical education and community engagement, the construction included a large gymnasium, assembly hall, and community spaces, providing a well-rounded environment for student development.

  • Infrastructure and Self-Performance: During this period, Michuda Brothers Construction self-performed many aspects of the project, from excavation to carpentry and beyond. The absence of modern subcontracting and machinery meant relying on skilled tradespeople and hand labor, underscoring the dedication and talent of the Michuda workforce.

HISTORICAL SIGNIFICANCE Built just before the Great Depression, Von Steuben Junior High School symbolized hope, growth, and investment in Chicago's future generations. Today, it stands as a historical structure, embodying Michuda Brothers Construction’s enduring commitment to building educational facilities that serve as pillars in their communities.

This project is a proud reminder of the company's legacy in shaping Chicago's educational landscape—an effort that has spanned generations and continues to inspire the Michuda name in construction excellence.

bottom of page